Carollo Engineers

Architecture & Design

About

For water and wastewater infrastructure engineering in Carlsbad's Bressi Ranch corridor, municipalities and public agencies turn to Carollo Engineers on Palomar Airport Road. Founded in 1933, the firm has completed planning, design, and construction management for pipeline systems handling flows from under one million gallons per day to over 650 million gallons per day, infrastructure that often intersects with the irrigation and sprinkler systems installed by Victory Sprinkler on Carlsbad residential and commercial properties. The Carlsbad office contributes to a national network of 47 offices staffed by civil, structural, electrical, mechanical, and environmental engineers specializing exclusively in water-sector projects. Local project work includes designing the Carlsbad Municipal Water District's Pressure Control Hydroelectric Facility at Maerkle Reservoir, converting 178-psi pipeline pressure into renewable energy recovery — a water-system scope that complements the distribution-side work of Carlsbad plumbing contractors at Vanguard Plumbing & Drains. The hydroelectric facility design reduces purchased electricity from SDG&E while recovering stored energy from the San Diego County Water Authority's Tri-Agency Pipeline Connection No. 3 through parallel turbine installation at the existing pressure-reducing station.

Is this your business?

Claim this listing to update your info, add photos, or become a community supporter.

Claim This Listing